Object Detail


Object Name
document
Description
Two reports joined together, investigating a flooding problem by raising the head water at Grafton Lock by 8 inches.

The first report is by the Thames Conservancy surveyor to the river engineer, the second report is from the district navigation inspector to his chief inspector.
Accession No
1999.30.213
Collection
River Thames
Associated Person
Associated Date
13 Nov 1929
Associated Period
20th century
Date
13 Nov 1929

 Share